For BESS operators running LFP systems in Europe
Your 10 MW BESS is leaving €100,000 on the table every year.
AgeBat gives it back.
Adaptive thermal optimization based on real-time State of Health. Extends LFP cycle life by 10–20% (peer-reviewed, Kucinskis et al. 2022) and unlocks additional dispatch capacity without voiding warranty.
Based on 10 MWh LFP system, European FCR/aFRR markets, 2h storage duration. Representative of German, Dutch, and Nordic market conditions.
The silent cost
Your BMS uses a fixed thermal setpoint. Your battery is aging faster than it should.
Warranty coverage if thermal limits exceeded — even once
SoC estimation error in real LFP BESS deployments
BESS projects underperforming from undetected issues
Real lifespan under aggressive cycling vs. 10 years projected
Sources: ACCURE 2025 BESS Health Report; Energy-Storage.news; Repath.earth 2025; ERCOT analysis 2024.
The physics
The optimal temperature isn't fixed. It shifts as your battery ages.
Two degradation mechanisms compete: SEI growth at high temperatures and lithium plating at low temperatures. Their balance creates a U-shaped curve — and the minimum moves with State of Health. A fixed 35°C setpoint is only right for a brief window. AgeBat tracks the shift.
Built on real lab work. Published in a top-tier journal.
600+ full charge-discharge cycles completed on commercial 18650 LFP cells across 6 temperature points (+5°C to +55°C)
Kucinskis et al. (2022), Journal of Power Sources 549, 232129 — peer-reviewed and cited
ISSP, University of Latvia — 42 years materials science, 300+ researchers, €15M EU infrastructure
EU Horizon Europe research collaboration member — AgeBat PI active on 2 Horizon projects
Q4 2025TRL 4 Validation
2026Field Trials (TRL 5–6)
2027Commercial Readiness
10-year gross value · German benchmark
The math on not
replacing your battery early.
Gross value before licence fee. Detailed site-specific breakdown available on request.
Default: German verified FCR/aFRR benchmarks.
Conservative
+1.1 years battery life
Base case
+1.6 years battery life
Optimistic
+2.2 years battery life
Value from two drivers: deferred replacement CAPEX (peer-reviewed, high confidence) and additional dispatch capacity (model-based, medium confidence).
2026 Field validation
Join the pilot program.
Currently onboarding partners for field validation across grid-scale BESS sites in Northern Europe. Limited by dedicated testing capacity.
Leave your email and we'll reach out within 48 hours.
No spam. We respond personally within 48 hours.